Building Infrastructure Deployment
Project Design Blueprint: Structured Cabling, Switching Core Matrix, and Node Allocation.
Core Network Switches
4 Units
24 & 48 Port PoE Managed Switches
RJ45 Keystone Drops
128 Nodes
Cat6 Structured Wall Outlets
Total Cat6 Structured Cabling
1,450 m
Solid copper low-smoke LSZH runs
Estimated Project Value
$8,400
Hardware hardware assets + labor installation
Structural Infrastructure Blueprint
Interactive MapHigh-level hardware flow path from ISPs down through internal floor levels:
======================= WAN EDGE INTERNET =======================
[ ISP Gateway Fiber Modem ]
│
▼
[ Hardware Firewall/Router ]
│
▼
====================== MAIN DISTRIBUTION RACK ====================
[ Core Switch - 48 Port L3 Managed ]
│ │
┌───────────┘ └───────────┐
▼ ▼
================= LEVEL 01 SYSTEM =================== LEVEL 02 SYSTEM ================
[ Access Switch 24p PoE ] [ Access Switch 24p PoE ]
│ │ │ │
├── [RJ45 Drop] ──► Workstation Cluster ├── [RJ45 Drop] ──► Accounts Dept
├── [RJ45 Drop] ──► Wall IP Phone ├── [RJ45 Drop] ──► VoIP Phone Network
└── [RJ45 Drop] ──► HD Security Camera └── [RJ45 Drop] ──► Ceil PoE WiFi AP
Hardware Component & Resource Allocation
| Item Specification | Category | Quantity Allocated | Cabling Status |
|---|---|---|---|
| 48-Port Managed Gigabit PoE+ Switch | Core Switch Hardware | 1 Unit | Mounted & Patched |
| 24-Port Intelligent Edge PoE Switch | Distribution Hardware | 3 Units | Terminating Trunks |
| Cat6 Pure Copper Solid UTP Cable (Spools) | Structured Wiring Media | 5 Boxes (1525m) | Conduits Pulled |
| RJ45 Gold-Plated Shielded Keystone Module | Node Connections | 128 Connectors | Punch-Down Test Phase |